We completed the disconnection, relocation and full reinstatement of water and drainage services for the relocated machinery workshop area at the Kat Gap Mine Site in Marvel Loch. The project included trench excavation, septic and pump system installation, leach drains, and new water supply connections to ensure reliable, compliant site infrastructure.