Kal Gas – Commercial Factory Completed works at the new commercial factory and office build for Kal Gas for Boord Construction. Read more
Aurizon - Bore and Standpipe Travelled to Leonora and completed a remote water upgrade with solar-powered bores, storage tanks, and a 6.4 m standpipe. Read more
Next Gen Building - Camp Connection and Septic Install Travelled to Marvel Loch and installed new water supply & septic systems for re-located buildings. Read more
6 Cooper Street - Subdivision Delivered subdivision plumbing: excavation, trenching, and water, sewer, stormwater installation to standards. Read more
Kat Gap - Leech Drain Installation Delivered drainage solutions at Kat Gap, improving water management and site safety. Read more