Design and construct a full water infrastructure upgrade in a remote area, installing a solar bore system with solar electric pump, two bore pumps, electrical reticulation to the diesel generator, and protected cable tray infrastructure.

Constructed engineered sand pads with drainage, installed six large-capacity water storage tanks and connected all pipework. Delivered end-to-end design and construction of a 6.4 m vertical standpipe system for high-capacity water cart filling.